大鸡巴日大鸡巴,日韩av电影在线不卡观看,5060午夜鲁鲁鲁鲁鲁,337P人体粉嫩胞高清

NEWS

Great news
Click Online Message

TEL:0391-5299981

EMAIL:qyyangnan@vip.163.com

ADDRESS:South Section of Taihang Avenue, QinYang

Juli News
Great news
Home > Juli News

Bending machine operating rules

Release time:2018-07-17 14:24:50 Source of the article:qyjljc Number of clicks:1487

  1. Check whether the mechanical properties are good, the workbench and the bending machine table are kept level; and prepare various mandrel tool stops.

  Second, according to the diameter of the processed product and the requirements of the bending machine, the mandrel, the forming shaft, the iron retaining shaft or the variable retaining frame are installed, and the diameter of the mandrel should be 2.5 times the diameter of the product.

  Third, check the mandrel, the block, the turntable should be free from damage and cracks, the protective cover is fast and reliable, and it can be operated only after the operation of the empty machine is confirmed.

  4. When working, insert one end of the product into the gap where the turntable is fixed. The other end of the bending machine is fixed against the fuselage and pressed by hand. Check that the fuselage is fixed and it is safe to block the side of the product. start.

  5. It is strictly forbidden to replace the mandrel, change the angle and speed control during the operation, and do not add or remove oil.

  6. When bending products, it is strictly forbidden to process the diameter, number of roots and mechanical speed of the product exceeding the mechanical specifications.

  VII. When bending high hardness or low alloy products, the standard diameter should be changed according to the mechanical nameplate and the corresponding mandrel should be exchanged.

  8. It is strictly forbidden to stand in the working radius of the curved product and on the side where the fuselage is not fixed. The bent semi-finished products should be stacked neatly and the hooks must not face upwards.

  9. When the turntable is reversed, it must be carried out after stopping.

  Ten, the operation is completed, the site is cleaned, the machinery is maintained, and the lock box is turned off.



  • PHONE
  • message
    MESSAGE
  • map
    MAP
  • ewm
    QR CODE
  • 盱眙县| 禄劝| 陆良县| 辽阳县| 西盟| 新干县| 云林县| 文登市| 楚雄市| 辽阳市| 青冈县| 遂平县| 达尔| 七台河市| 鄢陵县| 呈贡县| 龙陵县| 开江县| 汪清县| 镇原县| 保山市| 合作市| 德江县| 安顺市| 鄄城县| 松原市| 伊金霍洛旗| 金寨县| 鄂托克旗| 循化| 绥芬河市| 北宁市| 象州县| 邯郸县| 增城市| 尼勒克县| 南昌市| 临颍县| 贡觉县| 惠州市| 无极县|